Hyderabad Metro Rail Project

Nhance engineers designed entry and exit arms and walk way corridors for a number of stations of the Hyderabad Metro rail project. Each station requires design of four exit and entry arms. Our work required material optimization while considering lateral stability of the structures, designing foundations in the constrained areas and controlling the uplift. Our engineers also designed precast members and design and detail of connection between precast with cast-in members. The design process required three stage approvals which nhance managed seamlessly with the client team.

  • Location : Hyderabad, Telangana
  • Owner : Hyderabad Metro Rail Limited
  • Architect & client : L&T Metro Rail Ltd