Mesco wanted to rehabilitate the Wagon tippler that was originally designed for 81 tons but was never in operation to a new capacity of 140 tons and as per the latest RDSO design standards.Nhance proposed nondestructive testing of existing...
Nhance designed and provided fabrication drawings of Coal Handling Plant for the 2x67.5MW TPP. One of the design challenges was in designing the 54m tall slender junction tower for wind speeds of 180kmph while maintaining the deflection criteria...